• RSD Trucking – HVAC and plumbing design for trucking warehouse in Burlington, VT - Absolute Mechanical, Tony Edwards.
  • Compressed Air System at Industrial Facility – Design of new compressed air system for industrial facility - Siemens Building Technologies, Dana McGovern.
  • Smith & Wesson – Provide high pressure gas piping plans required for State permit approval - BG Mechanical, Bill Celatka.
  • Great Barrington Waste Water Treatment Facility – Boiler replacement design for an updated high performance boiler system in Great Barrington, MA – Tim Drumm
  • Highland Sugarworks – Proposed architectural floor plans including process systems for maple syrup packaging plant in Barre, VT – Jim MacIsaac
  • Essex Rescue – HVAC design for new emergency services building in Essex, VT – Sheet Metal Design – Jim Carew
  • Holyoke Gas & Electric – Provide drawings for renovations to replace existing district heating system in Holyoke, MA – BG Mechanical Services, Dave Riel
  • DST KVI Printers – Provide design/build and installation drawings - B-G Mechanical Contractors – Dave Riel, Vice President
  • Casella Waste Management – Provide design/build and installation drawings for HVAC and plumbing at Casella Waste Management in White River Junction, VT - Sheet Metal Design
  • Omni Measurement Instruments – Provide design/build engineering support for HVAC renovations in Milton, VT – Omni SMD
  • Liquid Measurements – Prepare design/build construction and as built drawings for sheet metal work related to the Liquid Measurements project in the Morse Industrial Park, Georgia, VT – Avonda Air Systems
  • Cape Cod Potato Chips – Indoor air quality studies and modifications design for renovations to the Cape Cod Potato Chips plant in Hyannis, MA – Lance, Inc. – Rick Theriault, Director of Safety
  • Leader Evaporator – Design/build HVAC plans for contractor to install exhaust ventilation systems for welding booths at the Leader Evaporator Company in Swanton, VT – Sheet Metal Design
  • Husky Injection Molding - Investigate and analyze potential CO spillage problems in boiler room at the Husky Injection Molding plant in Milton, VT – Husky Injection Molding
  • DST Output – Mechanical design for a 44,000 SF addition to the DST Output Facility in South Windsor, CT – B-G Mechanical Contractors – Dave Riel, Vice President
  • PBM Nutritionals – Piping design for Corrosion Piping Project at the PBM facility in Georgia, VT – Engelberth Construction, Inc. – Brock Rouse, Project Manager
  • PBM Nutritionals – Provide design documents for cooling of mix tanks to maintain product temperature control at the PBM facility in Georgia, VT – Engelberth Construction – Keith Morgan, Project Manager
  • Shaker Exhaust System – Design of new exhaust system for Cape Cod Potato Chips, Hyannis, MA – Jeff Mobed, Plant Manager

questions or comments?